Home / Mumbai / Mumbai News / Article /
WR begins work on Delisle bridge, to hit Virar-bound slow line services
Updated On: 16 November, 2019 05:40 AM IST | Mumbai | A correspondent
The work, which will go on from 1.25 am to 5.25 am every night for 40 days, started post midnight on November 13.

This picture has been used for representation purpose only
Work on Delisle road overbridge in Lower Parel has finally begun and the Western Railway has announced a traffic block of 40 days. The work, which will go on from 1.25 am to 5.25 am every night for 40 days, started post midnight on November 13.
According to the WR, Virar-bound slow line will be affected during the construction work. Five trains from Churchgate — 4.15 am Virar local and 4.19 am, 4.38 am, 4.46 am and 5 am Borivali locals — will run on fast line between Mumbai Central and Mahim, with halts at Lower Parel and Mahim stations, said the WR. Also, these trains will not halt at Mahalakshmi, Prabhadevi and Matunga Road stations.


